Data centers
The 2026 data center market, priced from the land up
North American colocation capacity under construction reached 7,481.1 MW in the first half of 2026, up 24.8% year over year, at a record-low 1.4% vacancy with 80.4% of that pipeline already preleased (CBRE). Counting hyperscale self-build, JLL puts North American construction at 66 GW, 95% pre-committed. For landowners the operative number is neither: it is Cushman & Wakefield's finding that Americas planned capacity reached 191.3 GW at end-2025 against 46.1 GW a year earlier — a 4.1x jump in demand for sites that do not yet exist.
Key takeaways
- CBRE, H1 2026, colocation in primary North American markets: 7,481.1 MW under construction, up 24.8%; vacancy 1.4%; net absorption 1,456.2 MW, up 11.7%; preleasing 80.4%; total supply growth 10,903 MW, up 33.7%.
- JLL, H1 2026, including self-build across all markets: absorption 25 GW, doubled year on year; vacancy 1% for a third year and expected near zero through 2028; 66 GW under construction, 95% pre-committed, 77% in frontier markets; rents up roughly 70% cumulatively since 2020.
- Cushman & Wakefield: global under construction 31.7 GW in 2025 against 12.5 GW in 2024; Americas 25.3 GW; Americas planned 191.3 GW; pre-committed including self-build 89%. Dallas displaced Northern Virginia as the world's number one primary market, followed by Atlanta, Virginia, Columbus and Johor.
- Atlanta overtook Northern Virginia on capacity under construction in H1 2026 at 2,882 MW, up 52.3%, with 10-plus MW pricing up 14.5%.
- Northern Virginia has 10.8 MW of available supply left against 4,496.5 MW of inventory and 0.2% vacancy.
A quarterly brief on powered land, port capacity and air-cargo gateways, plus the Powered Land and Gateway Pricing Benchmarks data file.
- Dollar per megawatt and dollar per acre benchmarks by market, with the substation-distance and voltage premiums applied
- Every committed United States port capacity opening from 2026 through 2035, with cost, TEU and date
- Airport-adjacent rent premiums by gateway, and the constraint map that drives them
- The named project pipeline: site, megawatts, developer, power source, status
- Sources and periods for every cell. Nothing unattributed.
Definition warning
Read this before quoting any megawatt figure
The three major brokerages publish numbers for capacity under construction that differ by roughly nine times, because they measure different universes.
| Source | Period | Under construction | What it counts |
|---|---|---|---|
| CBRE | H1 2026 | 7,481.1 MW | Colocation and wholesale only, primary North American markets |
| JLL | H1 2026 | 66 GW | North America, including hyperscale self-build, all markets |
| Cushman & Wakefield | 2025 | 31.7 GW global, 25.3 GW Americas | Global, including self-build, 107 markets |
Market by market, first half of 2026
| Market | Vacancy | Under construction | Notable |
|---|---|---|---|
| Northern Virginia | 0.2% | 2,420.2 MW, up 16.5% | 4,496.5 MW inventory, the largest globally; 10.8 MW available; 10-plus MW asking $160 to $185 per kW per month |
| Atlanta | — | 2,882 MW, up 52.3% | Passed Northern Virginia on construction; turnkey preleases about one year out, build-to-suit about 2.5 years out; 918 MW absorbed in six months per JLL |
| Dallas-Fort Worth | — | 765 MW, about 95% preleased | 3.7 GW planned but not started; number one global primary market per Cushman & Wakefield; most attractive market for 78% of investors per CBRE |
| Phoenix | — | 1.7 GW per JLL | 260-plus MW colocation absorption in H1; 442 MW absorbed per JLL |
| Chicago | 2.2% | — | Highest primary-market vacancy and still tight; no contiguous availability above 5 MW expected in 2026; 250 to 500 kW asking $200 to $230 per kW per month, the highest in North America; ComEd power delivery extends to 2032 or later |
| Columbus | 0.1% | — | Number four global primary market per Cushman & Wakefield |
| Hillsboro and Portland | 0.21% | 170.3 MW, more than 90% preleased | — |
| New York and New Jersey | — | — | Pricing up 19% for 10-plus MW requirements, the largest increase of any primary market |
| West Texas | — | 2.9 GW per Cushman & Wakefield | The single largest beneficiary of frontier-market migration per JLL |
| Austin and San Antonio | — | 1.7 GW completed | 796 MW absorbed per JLL |
Reno, Salt Lake City and Santa Clara are deliberately absent. No 2026 primary-source vacancy or rent figures are publicly available for them and we will not fill a gap with an aggregator number. See Methodology.
International rent benchmarks
CBRE Q1 2026, 250 to 500 kW deployments, dollars per kW per month: Singapore $330 to $475, the highest in the world; Tokyo $280; Frankfurt $235 to $265, the highest in Europe; Queretaro $250 to $270; Sydney $188; London $165 to $220; Sao Paulo $130 to $190.
Europe is dispersing away from its primary markets
European capacity is set to reach 13 GW by the end of 2026, up 20% year on year, with hyperscaler self-build up 22% to 4.3 GW — a seventeenth consecutive year of double-digit growth. The structural story is dispersal: FLAP-D accounted for only 252 MW, or 37%, of second-quarter 2026 deliveries, while non-FLAP-D markets took 55% of European take-up. Neocloud capacity in Europe quadrupled in the first half of 2026 to 420 MW from 89 MW, concentrated in the Nordics. FLAP-D vacancy is negative on the quarter; rest-of-Europe vacancy is forecast at 19% by year end — a genuine bifurcation risk.
The supply constraint is power, and it has a number
Cushman & Wakefield puts the global average wait for large-load power delivery at 4.4 to 4.5 years, with the Americas and EMEA at roughly five years and Asia-Pacific at two years and eight months. JLL puts grid connection in primary markets at more than four years. Specific ceilings: ComEd in Chicago at 2032 or later; West London substation upgrades into the early 2030s; Frankfurt into the 2030s; Hong Kong at five-year allocation lead times. Construction itself runs 24 to 48 months or more for large campuses.
“Record data center construction fails to ease capacity crunch.”
What this means for a landowner
Preleasing at 80.4% under CBRE’s definition, 89% under Cushman & Wakefield’s and 95% under JLL’s means the same thing under every definition: capacity is sold before it is built, so the binding constraint has moved upstream to land with deliverable power. That is why Americas planned capacity quadrupled to 191.3 GW while under-construction capacity only doubled. The pipeline is full of sites that are still being assembled, and assembly is a land transaction.
No fee. One parcel. One page. Usually back within five business days.
A quarterly brief on powered land, port capacity and air-cargo gateways, plus the Powered Land and Gateway Pricing Benchmarks data file.
- Dollar per megawatt and dollar per acre benchmarks by market, with the substation-distance and voltage premiums applied
- Every committed United States port capacity opening from 2026 through 2035, with cost, TEU and date
- Airport-adjacent rent premiums by gateway, and the constraint map that drives them
- The named project pipeline: site, megawatts, developer, power source, status
- Sources and periods for every cell. Nothing unattributed.
This research was produced by Landside Partners, a commercial real estate research and advisory firm working with owners of industrial land across North America on data center, seaport and air-cargo demand. To have a specific parcel assessed, contact Brad Cohen at Landside Partners.
Related research
- Ports — Pillar: committed, funded and dated US gateway capacity and near-port industrial pricing, Q2 2026.
- Air Cargo — Pillar: airport-adjacent industrial metrics and cargo gateway rent premiums, Q2 2026.
- Markets — Index of the twelve covered metros with each market's headline figure, Q2 2026.
- Research — Research hub: powered land, floating siting, ports and air cargo, published free in full.
- Powered Land Premium Calculator — Interactive calculator applying published Altus Group substation-distance and service-voltage premiums to market land bands, Q2 2026.
Published · Last updated